Material calculator
Choose the object and enter the area: the site calculates the materials and containers you need.
You will need
for 100 m², with a 10 % reserve
-
Bitumen primer
25 kgPackaging: 2 × 18 kg metal bucket, green or 2 × 17 kg plastic bucket, red
By the label: 18 kg ≈ 80 m².
-
Bitumen mastic
297 kgPackaging: 1 × 200 kg barrel + 5 × 20 kg bucket
mastic use ≈ 2.7 kg/m²
The estimate is approximate: actual use depends on the base and the layer thickness. Our specialists will confirm the exact amount.
Get a price for this estimate
Leave your name and phone: the estimate is added to your request automatically.